City Of Berkeley Transfer Power Station

Berkeley Transfer station City of Berkeley

Panel Upgrades, New Wiring Mee Industies, Inc. installed a high-pressure, misting sprayer to control the dust at the City of Berkeley Transfer Station.

Berkeley Electric was called in to install a 480-volt, 60-amp power source for the high-pressure sprayer motor and control system. We also installed the four control stations located in the transfer warehouse.

To accomplish this project, we worked in motorized man lifts at heights up to 35-feet from the ground. All work had to be done after-hours and was coordinated by the Berkeley and Mee Industries supervisors.